After a vacation hiatus and waiting for the Rockler steamer to arrive I was able to get back to work. Perfect timing as it looks like I will have little else to do while "sheltering at home" for perhaps a month or more...gulp.
First off was gluing down the bottom which went without a hitch.
Then came the stringer which I had originally tried to do without steaming which did not work.
So after picking up a steamer and poly tubing as advised be Bob Wessel I put my first stringer up this afternoon.
This is a little fitting I fabricated to make the connection with the tubing
The stringer is in place with the poly still on, tomorrow I will pull it off and then make sure it is dry before gluing. The three more I have to do should go a little quicker than the first.
No comments :
Post a Comment